
The vines have been pinned in place behind the flute player. I moved the pomegranate tree and I will put the pond in front of the tree. I wanted to be able to see the stairs behind the tree. I think the next thing I will do is to start stitching the surface elements in place. Everything will be stitched in sequence layer by layer which will take a few days. I will also need to attach the pool to the quilt. I decided I will put the pool further back in the scene. Once that is done the final shading on the background can be finished.After that step is completed I can start adding the plants in the front and do some surface embroidery.
No comments:
Post a Comment